Plate Charging Bath

The plate charging bath applies to the plate formation/charging process.

  • BETTER
  • CHINA
  • Information

Technical instruction:

1. In the plate charging bath, it adopts full closed ventilation method, so the wind loss is less and it can prevent the leakage of acid fume.

2. The tank material is PP, thickness is 15mm.

3. There are two inner lines of formation tank in one line, each line is 11M length.

4. On the top of tank, there is one double suction wind tunnel and door plank, used for fume collection, both of them are made of 5mm PP, door plank adopts bending reinforcement,  no deformation during using.

5. The water tank is equipped with rib reinforcement, the edges are flat and there is no leakage in the whole tank.

6. The formation capacity is 10000 big panels daily.

7. The dimension of formation tank is 540*260*435, each line contain 70 pcs tank. In base of 20 hours formation process, it needs 5 lines for 10000 panels.

8. Under the bottom of this device, it requires anticorrosion treatment on the base. And it should be treated by buyer .

9. For 5 lines of plate formation system, it requies 1 set of fume collection system with capacity of 40000 M³/H.


Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required
For a better browsing experience, we recommend that you use Chrome, Firefox, Safari and Edge browsers.